Exit 2000



Batson Groundwork and Construction has been established now for 2 years. In this short time we have made some very good relationships with out clients.
Understanding the importance of health and safety have been accredited to the CHAS scheme.

Sustainability now plays a major part for today's companies. We use all of our resources to recycle and reuse all materials where possible. We source as much material as possible from local suppliers.

Quality and continuous improvement is of paramount importance to us at Batson Groundwork and Construction Services.
We strive to work to the very highest of standards in all aspects of our work.

Batson Groundwork and Construction Services is proud of its good health and safety record. Our health and safety policy is constantly being updated to meet legislative changes and developments.

All our staff are trained in the disciplines of their duties. All our employees are actively encouraged to seek further qualifications and training for their personnel delvelopment.
All staff are CSCS or CPCS Trained.



Construction of a tarmac path leading to a MUGA unit erected for Blyth Council


Playground construction at Howden Park, North Tyneside, using all the spoil from the site to create a natural play environment.

Private blockpaved drive with new drainage and recess cover.



Construction of a carpark using Geo Grid to allow heavy traffic but retain the natural grass look and allow natural drainage through the Geo Grid structure.

Complete redesign and construction of back garden to include a new fence, patio, decking and turf.



Site clearance of nursing home, making ready for the area to be developed into seating and relaxation park for the elderly including the removal and treatment of Japanese Knotweed

Construction of a park at Gateshead Toddlers area with no fines concrete base, ready for wet pour rubber safety surface.

Replacement of a new solid metal fence to the perimeter of a parish town park


Construction of a conservatory using Brad stone for a private client.



New Build, a self build project, which we managed for a client.



Complete construction of a playpark at West Auckland



Construction of a MUGA system built at New Brancepth, Durham. One of several areas which we installed for the client in this area.


Valid RSS
W3 Validator
Valid CSS!

Animation     Shop     Ironworks     Bunka Visuals     Interior Design     Sign Writing     Group Work     Photo Restoration     About Us     Contact Us


215-217 Newgate Street, Bishop Auckland, DL14 7EL
Tel: (01388) 205950
Mob: 07904058312

All content © Exit 2000 2011.   Designer: Andrew Mackie. Constructed and Maintained by: David Fogg

Many thanks to the following companies for their support with our charity work this year:

Rosco


J&C Joel

Thimbleberry Music and Arts Festival

Batson Groundwork and Construction Services

Greenheart Workshops

Lorraine's Wedding Dresses